Type marks the drawings already use.
Type mark, catalog number, finish, lamping, and voltage in the same table the set uses. Punch list is an install, not a redesign.
Architects
The designer or architect specifies. Cut sheets, the selection, and the fixture schedule stay on the project. The contractor submits what was specified and installs it.
How this pays for you
Type mark, catalog number, finish, lamping, and voltage in the same table the set uses. Punch list is an install, not a redesign.
The submittal is a check against the specification, not a second chance to redesign the job. Purchasing orders the specified catalog numbers.
The owner, the designer, and the field work from the same fixture schedule. The finished room still matches the drawings.