Architects

A fixture schedule the field can build.

The designer or architect specifies. Cut sheets, the selection, and the fixture schedule stay on the project. The contractor submits what was specified and installs it.

How this pays for you

Type marks the drawings already use.

Type mark, catalog number, finish, lamping, and voltage in the same table the set uses. Punch list is an install, not a redesign.

Cut sheets with the fixture schedule.

The submittal is a check against the specification, not a second chance to redesign the job. Purchasing orders the specified catalog numbers.

One specification, not four catalogs.

The owner, the designer, and the field work from the same fixture schedule. The finished room still matches the drawings.